Manufacturing controls for investigational drugs and biologics must scale with development. Sponsors and CMC teams have to decide how much of 21 CFR part 211 applies to each clinical batch, when the Phase 1 exemption no longer applies, and what FDA will expect at the pre-approval or pre-license inspection. If they misjudge these transitions, clinical holds, Form 483 observations or a complete response letter can delay a program.
The analysis below covers the regulatory framework that sets CGMP expectations at each stage, from the 21 CFR 210.2(c) exemption and statutory CGMP under FD&C Act section 501(a)(2)(B) through Phase 2/3 manufacture and process performance qualification before commercial distribution. It then reviews FDA warning letters, Form 483 observations and CRLs that show how the agency applies these expectations to investigational and commercial products.
CGMP across clinical phases: the 21 CFR 210.2(c) Phase 1 exemption, Phase 2/3 and commercial manufacturing
FDA treats CGMP as a requirement that applies from the first batch dosed in humans. What changes with development is which rules apply and how strict the controls must be:
- Phase 1: most investigational drugs, including biological drugs, are exempt from 21 CFR part 211 under 21 CFR 210.2(c), until the drug is made available for a Phase 2 or 3 study or is lawfully marketed. They remain subject to statutory CGMP under FD&C Act section 501(a)(2)(B) 299118.
- Phase 2 and Phase 3: manufacture is subject to parts 210 and 211. The type and extent of controls may still differ from commercial manufacture 310311.
- Commercial: the manufacturer must complete process performance qualification (PPQ) before commercial distribution 291. In the CRLs reviewed here, FDA withheld approval until CGMP and pre-approval or pre-license inspection deficiencies were resolved 173182.
FDA has enforced these expectations through warning letters for later-phase investigational products, Form 483 observations on clinical batches, and CRLs that cite facility deficiencies.
The legal baseline: statutory CGMP applies to every drug
Under 21 CFR 210.1, parts 210, 211, 213, 225 and 226 set the minimum CGMP requirements for the methods, facilities and controls used to manufacture, process, pack or hold drugs. Their purpose is to assure safety, identity, strength, quality and purity 6. If a firm fails to comply with any of these regulations, the drug is adulterated under section 501(a)(2)(B). Both the drug and the responsible person are then subject to regulatory action 7.
FDA's Phase 1 CGMP guidance confirms that section 501(a)(2)(B) applies to investigational drugs. A drug is adulterated if its manufacturing methods, facilities or controls do not conform to CGMP 117. The part 211 exemption therefore changes which detailed rules apply. It does not remove the statutory duty.
Phase 1: exempt from part 211, not from CGMP
What 21 CFR 210.2(c) says
The regulation states that an investigational drug for use in a Phase 1 study (as described in § 312.21(a)) "is subject to the statutory requirements set forth in 21 U.S.C. 351(a)(2)(B)." It adds that "the production of such drug is exempt from compliance with the regulations in part 211" 299.
FDA's 2008 Phase 1 guidance
FDA explains how to meet statutory CGMP in Phase 1 in Current Good Manufacturing Practice for Phase 1 Investigational Drugs (final, July 2008) 95. Key points:
- CGMP applies to every batch. CGMP must be in effect for every batch used in Phase 1 trials. Controls may be tailored to the manufacturing situation using sound scientific and quality control principles 119.
- Product scope. The guidance covers investigational drugs and biological products, including finished dosage-form placebos, that are eligible for the part 211 exemption. Examples include recombinant and non-recombinant therapeutics, vaccines, allergenics, plasma derivatives, gene therapies and somatic cellular therapies 12239.
- Express exclusions. The guidance does not cover:
- HCT/Ps regulated solely under PHS Act section 361
- products manufactured for Phase 2/3 trials
- already-approved products used in Phase 1
- PET drugs 123
- Blood and blood components. Manufacturers must still comply with applicable provisions of parts 600 to 660 50.
- Contract manufacturing. Using a contractor does not shift responsibility. Both the sponsor or manufacturer and the contractor are responsible for CGMP compliance 42.
Controls FDA expects in Phase 1
The guidance recommends well-defined written procedures, controlled equipment and environments, and accurate, consistent manufacturing and testing records 125. Manufacturing hazards should be identified and mitigated systematically 126. The specific recommendations cover the following areas.
| Area | FDA recommendation |
|---|---|
| Personnel | Suitable education, experience and/or training, plus familiarity with QC principles 127. |
| Quality control function | A written QC plan covering material examination, procedure approval, batch release or rejection after record review, and investigation of errors and complaints. QC staff should preferably be independent of manufacturing 128. In very small operations, one person may perform both manufacturing and QC, but FDA strongly recommends periodic review by another qualified person 129. |
| Facility and equipment | Adequate space, cleanliness, utilities, ventilation and air-quality controls. Equipment should be maintained, calibrated, cleaned and identified in records 130. |
| Components, containers and closures | Written acceptance procedures and traceability from receipt to batch 131132. Review of each lot's certificate of analysis, and confirmatory identity testing on each API batch 133. |
| Manufacturing records | Records detailed enough to replicate manufacture, including changes and their rationale. Documented microbial and endotoxin controls for sterile-processed products 134. |
| Laboratory controls and stability | Scientifically sound tests. Retained samples kept for at least two years after the trial ends or the IND is withdrawn. Stability studies covering the period from manufacture through last administration 135136. |
| Packaging, labeling, distribution | Safeguards against mix-ups, and distribution records that support recall under § 312.57(a) 137138. |
| Recordkeeping | Complete records, including records of deviations, investigations and complaints 139. |
The guidance also covers special manufacturing situations:
- Multiproduct facilities: FDA recommends making one investigational drug at a time in a separated area. Shared use is possible with effective cleaning and procedural controls 140.
- Biological and biotechnology products: these need particularly careful process control and precautions against adventitious agents 141.
IND CMC content and FDA's oversight tools in Phase 1
21 CFR 312.23(a)(7) requires enough CMC information in every phase to assure the proper identity, quality, purity and strength of the investigational drug. The amount of information varies with the phase, the trial duration and the dosage form 9. For an initial Phase 1 IND:
- The emphasis is on identifying and controlling raw materials and the drug substance. Final specifications are not expected until the end of the investigational process 9.
- Stability data are required in all phases 10.
- Sponsors should file information amendments as production scales up 11.
The Phase 1 guidance notes that FDA can inspect a Phase 1 manufacturing operation, place a proposed or ongoing Phase 1 trial on clinical hold, or terminate the IND. These actions may follow evidence that inadequate QC procedures compromise product safety 144. Two of the clinical hold grounds in 21 CFR 312.42 are relevant to product quality:
- unreasonable and significant risk to subjects
- insufficient § 312.23 information to assess risk
Both apply to Phase 1 and carry over to Phase 2/3 holds 3.
When the Phase 1 exemption ends
Section 210.2(c) sets two triggers that end the exemption 299:
- the investigational drug "has been made available for use by or for the sponsor in a phase 2 or phase 3 study", or
- the drug has been lawfully marketed.
After either trigger, "the drug for use in the phase 1 study must comply with part 211" 299. The trigger is when the drug is made available for a later-phase study, not when that study is completed.
The 2008 guidance draws two consequences from this:
- If the sponsor has already manufactured the drug for Phase 2 or 3, later Phase 1 manufacture must also comply with part 211. This applies regardless of trial size or dosing duration 40.
- Already-approved products used in Phase 1 trials (for example, for a new indication) fall outside the guidance's scope 123.
Two practical points follow:
- "Early-phase" does not mean "Phase 1." FDA's 2015 guidance on early-phase cell and gene therapy trials includes some Phase 2 trials in its early-phase scope. Calling a study "early-phase" therefore does not establish eligibility for the exemption 44.
- The rule holds across product types. FDA's Psychedelic Drugs: Considerations for Clinical Investigations (July 14, 2026) states that drugs manufactured for Phase 2 and beyond must comply with applicable part 211 regulations 319.
Phase 2 and Phase 3: part 211 applies, with phase-appropriate controls
The 2008 guidance states that "Phase 2 and 3 manufacturing will continue to be subject to parts 210 and 211" 310. FDA also recognizes that the controls, and how far they extend, differ in two ways:
- between investigational and commercial manufacture
- among clinical phases 311
The cannabis quality guidance (January 23, 2023) repeats this position. It states that parts 210 and 211 govern CGMP for Phase 2/3 investigations and for marketed products 241.
The 1991 guidance still applies to Phase 2/3
For Phase 2/3 material, FDA continues to point to Preparation of Investigational New Drug Products (Human and Animal) (March 1991, reprinted November 1992). The 2008 guidance replaced it only for Phase 1 drugs within its scope 317239. The 1991 document makes three points:
- Producing clinical supplies requires CGMP compliance, including qualified facilities and equipment and validated processes 314.
- Where only a single batch is made, or process changes make it hard to replicate, limited process validation may be acceptable. In that case, extensive in-process controls and product testing support the batch. More comprehensive validation is expected as uniform batches are produced under replicated conditions 315.
- Procedures and analytical methods are expected to become more specific as development nears completion 316.
FDA's 2024 decentralized trials guidance still directs sponsors to section VII of the 1992 reprint for Phase 2/3 packaging and labeling operations 318.
API manufacture for clinical trials (ICH Q7, section 19)
FDA's ICH Q7 guidance (September 2016 edition) 376 sets out development-stage expectations for APIs used in clinical trials:
| Q7 section | Expectation |
|---|---|
| 19.1 General | Controls should match the stage of development. Clinical APIs should still be made in suitable facilities under appropriate production and control procedures 403. |
| 19.2 Quality | A quality unit independent of production should approve or reject each batch 404. |
| 19.3 Equipment and facilities | Equipment should be calibrated, clean and suitable for use, including in small-scale or laboratory settings 405. |
| 19.6 Validation | Process validation is normally inappropriate for a single batch or for batches that cannot be replicated. Batches made for commercial use require section 12 process validation, even at pilot scale 406. |
| 19.7 Changes | Every change to production, specifications or test procedures should be recorded 407. |
Cell and gene therapy products
FDA's August 2026 cell and gene therapy FAQ guidance states two expectations 2345:
- Drug product manufacture must comply with part 211, except for most Phase 1 investigational drugs.
- CMC development, including CGMP compliance, should mature in step with clinical development.
The 2024 CAR T guidance gives stage-specific examples:
- Assays should be fit for purpose in early studies and qualified before studies that will provide primary evidence of effectiveness 47.
- Vectors must be manufactured under CGMP for later-phase studies and licensure, and vector facilities are subject to inspection during BLA review 48.
The May 2026 CMC flexibilities guidance for cell and gene therapy BLAs also discusses implementing phase-appropriate CGMP. It describes the Phase 1 exemption as applying to studies designed to establish basic safety rather than efficacy 2843.
Commercial manufacturing: PPQ before distribution and inspection-gated approval
Under FDA's Process Validation: General Principles and Practices (January 25, 2011) 260, a manufacturer "must successfully complete PPQ before commencing commercial distribution of the drug product" 291. The guidance limits this in several ways:
- Concurrent release of PPQ batches is expected to be rare. Concurrently released lots must still meet all CGMPs and lot-release criteria 292293.
- Clinical trial material is excluded. The guidance's definition of "commercial manufacturing process" excludes clinical trial and treatment IND material 294.
- Clinical supplies should follow CGMPs appropriate to their phase of clinical study 295.
For cell and gene therapies, FDA points to part 211 Subpart F as the source of the process characterization and validation studies needed to meet CGMP 242.
How FDA enforces these expectations
Warning letters for investigational products
CARsgen Therapeutics Corporation (CBER, July 26, 2024). This letter shows FDA applying part 211 to Phase 2 investigational biologics.
- Products. Two autologous CAR T cell products, CT053 (anti-BCMA) and CT041 (anti-claudin 18.2), had been made available for a Phase 2 study under § 312.21(b). FDA expressly applied CGMP requirements "including 21 CFR parts 210 and 211" 426.
- Findings. The cited violations 428 were:
- a scuttle-fly infestation, with larvae found in cleanroom monitoring samples (§ 211.56(a)) 477
- no non-viable particulate or active-air viable monitoring during open manipulations (§§ 211.42(c)(10)(iv), 211.113(b)) 478
- unvalidated cleaning of equipment and cleanrooms (§ 211.42(c)(10)(v)) 479
- no procedure for 100% visual inspection of final product for particulates (§ 211.100(a)) 480
- personnel monitoring excursions with CAPAs that were never implemented, followed by product release after further excursions (§ 211.192) 481
- Legal basis. FDA found the products adulterated under section 501(a)(2)(B) and cited prohibited acts under sections 301(a) and 301(k) 482.
- Firm's response. The firm had paused manufacturing and told clinics not to administer released product. FDA still found the response insufficient in parts 486.
Celltex Therapeutics Corporation (CBER, September 24, 2012). FDA cited significant CGMP and CGTP deviations in manufacturing autologous adipose-derived mesenchymal stem cell batches 335347.
- Clinical context. Celltex had encouraged physicians to enroll patients in its clinical trials 345.
- Applicable requirements. FDA cited section 501(a)(2)(B), PHS Act sections 351(a) and 361, and 21 CFR parts 210, 211 and 1271 347.
- IND status. FDA separately found that the product had neither an approved BLA nor an IND in effect 348.
Kimera Labs, Inc. (September 1, 2023). This letter combines IND status with CGMP findings, but the clinical-manufacturing link is weaker than in the two letters above.
- FDA noted that one exosome product had an IND in effect as of May 12, 2023 435.
- FDA cited deviations from section 501(a)(2)(B) and parts 210 and 211 for more than 37,000 vials made between April 2020 and June 2022 436.
- The letter does not state that the cited manufacturing was for clinical trials 437.
Gap in the public record. We did not find a warning letter that sets out FDA's Phase 1 statutory-CGMP analysis under 210.2(c) or the 2008 guidance. The Phase 1 guidance identifies inspection, clinical hold and IND termination as FDA's tools for Phase 1 quality problems 144.
Form 483 observations on clinical batches
- Sancilio & Company, Inc. (January 20, 2017). FDA identified finished products used in clinical trials and registration batches supporting NDAs and INDs 8082. The observations included:
- incomplete investigations of stability failures in assay, related compounds and dissolution, with inadequate CAPA 82
- a probable cross-contamination root cause that was not extended to other products made on the same equipment 83
- cleaning verification methods that were not validated before clinical batch production 84
- Berkshire Sterile Manufacturing (October 21, 2024). Observation 6 concerned an inadequately documented investigation into metal-like particles between stopper and vial in three units of a clinical batch 8789. Observation 5 cited overdue SOP training and a breach of personnel limits in a cleanroom corridor 90.
- Gilead Sciences, Inc. (April 26, 2013). Test methods for clinical and primary stability batches differed from the proposed commercial methods, and no bridging study established comparability 737576. This is an example of an investigator scrutinizing the link between development-stage and commercial controls during a pre-approval context.
CRLs: CGMP status as a gate to approval
At the application stage, FDA routinely issues CRLs that withhold approval until facility CGMP deficiencies are resolved. Selected CRLs include the following:
| Product / application | Company | CRL date | Facility/CGMP language |
|---|---|---|---|
| BLA 761115 | Immunomedics, Inc. | 2019-01-17 | The investigator "observed objectionable conditions"; resolution was required before approval 152182. |
| Fluorescein/benoxinate ophthalmic solution, NDA 211039 | Bausch Health Ireland Limited | 2019-07-19 | Drug substance methods, facilities and controls "do not comply with" parts 210 and 211 155230. |
| BLA 761084 | Kashiv BioSciences, LLC | 2021-08-11 | Remaining objectionable conditions had to be resolved, and verified by FDA, before approval 161202. |
| Paclitaxel protein-bound particles, NDA 218762 | Accord Healthcare Inc. | 2024-12-05 | CGMP deficiencies at both the drug product and drug substance facilities. Satisfactory PAI and surveillance outcomes were required 164210212. |
| Nilotinib capsules, NDA 215644 | Sun Pharmaceutical Industries Limited | 2025-06-25 | The facility had to "come into compliance with CGMP." CGMP reinspection and/or an additional PAI may be required 165173174. |
| Apitegromab, BLA 761463 | Scholar Rock, Inc. | 2025-09-22 | CGMP inspection deficiencies; a subsequent PLI may be needed 159198199. |
| BLA 761438 | Swedish Orphan Biovitrum AB (publ) | 2026-06-26 | Deficiencies after CGMP inspection and PLI; reinspection and/or additional PLI possible 145168169. |
Many of these letters state that "satisfactory outcomes of both the PAI and the CGMP surveillance inspections will be needed prior to approval" 178196. In these CRLs, FDA made resolution of the identified facility CGMP deficiencies a precondition for approval.
Practical implications for sponsors
-
Plan the end of the exemption at the clinical-plan level. Phase 1 material made outside part 211 cannot be carried into Phase 2/3, and once a lot is made available for Phase 2/3, later Phase 1 manufacture loses the exemption 29940.
-
Treat statutory CGMP in Phase 1 as substantive. Phase 1 controls still need:
- a written QC function
- batch-release review
- confirmatory API identity testing
- aseptic controls for sterile products
Inadequate QC can lead to clinical hold or IND termination 128133134144.
-
Expect part 211 scrutiny of Phase 2/3 operations, including at CDMOs. In the CARsgen letter, FDA cited a Phase 2 cell therapy manufacturer for the same part 211 subpart violations it cites at commercial sites 426428. Sponsors remain responsible for their contractors 42.
-
Build the bridge to commercial controls early. The Gilead 483 shows that method changes between clinical and commercial batches need documented comparability 76. PPQ must be complete before commercial distribution 291, and facility CGMP status drives CRL outcomes 173182.